Back in 2021, Kimley-Horn, a nationwide engineering firm, dropped a YouTube video titled “Single-Family for Rent 101” (which we will embed in this post), breaking down the rising single-family for rent (SFR) market—a housing model packing 9-14 units per acre, slotting into the “missing middle” between traditional homes and apartments. The video, recorded four years ago, highlights SFR’s appeal to young professionals, families, and empty-nesters wanting space and amenities without the burden of homeownership. Kimley-Horn isn’t waving pom-poms for SFR to take over; they’re pitching themselves as the go-to experts for developers and municipalities tackling its complexities. Think tricky entitlements, dense site planning, and infrastructure costs. It’s not advocacy for SFR itself but a savvy sales pitch for their services, saying, “This is a hot trend, and we’ll help you navigate it.” Their expertise spans nationwide, with 4,500+ staff and experience in millions of housing units, but their focus is on making SFR projects profitable, not pushing a housing revolution.
Fast forward to 2026, and here in Wakulla County, Kimley-Horn’s influence is front and center. They conducted an impact fee study that the county has refused to use. Since 2020, Wakulla has been booming, with new construction increasingly shifting toward rentals, including SFR-style developments. This tracks with Kimley-Horn’s video, which noted the post-COVID demand for space-heavy rentals. But here’s the catch: hiring a firm like Kimley-Horn, which operates on a national scale, feels like a gamble for a place like Wakulla. The impact fee study showed they are crunching numbers based on stats, not our county’s unique character or demographics.While Kimley-Horn’s video screams, “Trust us to handle the complexities,” their role in Wakulla raises questions about whether an outsider’s data-driven lens can truly reflect our community’s needs.
With millions of new residents migrating to Florida in the past decade and more arriving every year, our roads clog, schools fill, parks strain, and infrastructure creaks under the weight. Locals in counties like Wakulla feel it daily: longer commutes on rural roads, higher property taxes subsidizing newcomers, and a nagging sense that Florida is already full. Enter HB 399 (now Chapter 2026-7, signed March 27, 2026), a major new state law designed to speed up housing and development. It caps arbitrary local application and processing fees, forces objective compatibility reviews for residential projects, green-lights modular and manufactured homes in single-family zones, fast-tracks routine upgrades at big resorts, and even shields compost and agricultural facilities from NIMBY-style road-expansion demands. The clear goal: cut red tape, boost supply, and make building easier.
That is great for housing affordability and economic growth. But here is the rub: HB 399 does not touch the single most effective tool locals still have to ensure growth pays for itself: impact fees.
What HB 399 Actually Changed (And What It Did Not)
Effective mostly right away or January 1, 2027, the law:
Requires development application and processing fees to be tied only to the actual direct and indirect costs of reviewing permits. No more sneaky percentage-of-project-value charges that acted like hidden taxes.
Shifts compatibility reviews toward specific, evidence-based factors and mitigation, reducing vague neighborhood character vetoes.
Mandates as-of-right permitting for off-site constructed (modular or prefab) homes in single-family districts.
Protects existing compost and organic processing facilities from being forced to buy extra land just to widen private roads for trucks.
All of this tilts the scales toward faster, cheaper development. In a state already bursting at the seams, that means more homes, more traffic, more demand on parks, fire and EMS, and roads without automatic new revenue to match.
Impact fees are untouched. They remain fully legal and available under § 163.31801, F.S. These are one-time, proportional charges on new development to fund the exact capital infrastructure the new growth creates (roads, parks, multimodal improvements, etc.). They must be based on real data, earmarked, and meet strict constitutional rational nexus tests. HB 399 left this entire framework alone.
Wakulla County’s Wake-Up Call: Zero Impact Fees and a Stalled Study
Wakulla County is a perfect case study. You repealed impact fees back in 2011. Today, as of April 2026, you still have none. No transportation fees. No recreation fees. Just the basic building-permit processing charges plus the mandatory solid-waste and fire fee on new single-family homes.
In 2025 the Board of County Commissioners (BOCC) did the right thing: spent $32,000 to $35,000 on a professional Kimley-Horn Impact Fee Study. The September 2025 recommendations focused on two categories:
Recreation (parks, boat ramps, trails: high demand from new residents)
Multimodal transportation and mobility (roads, signals, sidewalks, bike paths)
The BOCC accepted the study, albeit with admitted errors, on October 6, 2025, and then did nothing. No Phase 2. No ordinance drafting. No public hearings on actual fee schedules. Local news called it dead in the water. The study still sits on the county website for public review, but momentum vanished.
Meanwhile, Wakulla keeps growing. New subdivisions pop up. Tallahassee spillover and coastal migration continue. Existing taxpayers foot the bill through higher ad-valorem taxes, deferred maintenance, and overcrowded facilities.
Why Impact Fees Are the Smart, Fair Solution
Impact fees are not anti-growth. They are pro-responsible growth. They simply say: If your new project creates new demand, help pay to meet it. Here is what they deliver in Wakulla’s context:
Fairness to longtime residents. Why should families who have paid taxes for decades subsidize brand-new subdivisions’ roads and parks? Impact fees shift the marginal cost to the people creating the marginal demand.
Better infrastructure, not just more sprawl. The Kimley-Horn study already identified recreation and transportation as the biggest near-term needs. Fees collected at building-permit stage go straight into segregated accounts for those exact projects.
Complements HB 399 perfectly. The new law makes development cheaper and faster on the regulatory side. Impact fees provide the fiscal backstop so growth does not erode quality of life. You get the housing supply boost and the revenue to handle it.
Legally bulletproof and limited. State law caps routine increases at 50 percent every four years unless truly extraordinary circumstances exist (recent AG opinions reinforce this). Wakulla could start modest, data-driven, and focused exactly where the study recommended.
Other growing Florida counties use them successfully. Wakulla is one of the few fast-growing counties without them, and it shows in the strain on public services.
Time to Act: Before the Next Boom Wave Hits
The study you already paid for is still valid. The BOCC can direct staff to draft an ordinance tomorrow. All it takes is political will and citizen pressure.
Here is what you can do right now:
Email or call your BOCC commissioners and ask them to put the impact-fee ordinance on the next agenda.
Show up at the next BOCC or Planning Commission meeting and speak during public comment. Reference the Kimley-Horn recommendations.
Share this post and the county’s own study link: mywakulla.com (search Impact Fee Recommendations).
Remind neighbors: This is not about stopping growth. It is about making sure growth does not come at your expense.
Florida’s growth is not stopping. HB 399 just made it easier. The only question left is whether Wakulla County will be smart enough to make that growth pay its own way or keep handing the bill to the people already here.
Impact fees are not a tax on developers. They are a promise to existing residents that new growth will not degrade the quality of life you moved here (or stayed here) to enjoy.
Wakulla, it is time. Use the study you already bought. Adopt impact fees. Protect your taxpayers, your roads, your parks, and your future.
The Wakulla County Board of County Commissioners meets Monday, April 6, 2026 at 6:00 p.m. in the Commission Chambers, 3093 Crawfordville Highway. The Full Agenda is 500 plus pages.
Quick Agenda Overview
Consent items are mostly routine housekeeping, but a few deserve a closer look. The real weight is in General Business Items 13 through 18, especially the full-court press on Project Safety / Point Blank Enterprises. Consent Agenda Highlights (Items 1–12, 19–21)
Item 4 – Reappoint Sean Masters to the Industrial Development Authority for a new 4-year term ending April 18, 2030. He has served continuously since 2016. Routine.
Item 5 – Schedule and advertise public hearings on a Land Development Code amendment adding a formal definition of “Automotive Sales.” Impact on property owners (straight from staff analysis):
Properly zoned commercial dealerships or lots: No practical change.
Rural/residential properties: Displaying four or more vehicles for sale/lease at once now clearly counts as “automotive sales” (code violation in prohibited districts).
Casual sellers (1–3 vehicles): Unaffected. This gives code enforcement an objective, measurable standard instead of endless subjective arguments.
Item 8 – Approve the County’s participation in the National Opioid Settlement with the Six Remnant Defendants. In March 2026 the County received notice of this new national settlement. Unlike earlier rounds that flowed through the State, this one pays directly to participating local governments. The six remnant defendants are paying a combined $97,625,000 in cash, distributed in one-time payments according to a population-based Plan of Allocation. Wakulla County’s exact multiplier is 0.0089927449 percent of the total distribution, which works out to just under $9,000. Staff expects these funds to go to the Wakulla County Sheriff’s Office for criminal-justice-involved persons with opioid use disorder and co-occurring mental-health/substance-abuse issues.
Item 9 – Simple administrative cleanup: Assignment of the Public Safety Medical Director contract from Dr. Colby Redfield’s sole proprietorship to his new PLLC. No substantive change.
Item 10 – Ratify letters of support (dated March 2, 2026) for two grant applications from Rep. Dunn’s office:
$2.5 million for the new Wakulla Fire Rescue Station 3 (which could also serve as WCSO auxiliary space).
$3 million for the Wakulla Regional Preparedness and Training Complex (fire training burn tower plus Emergency Vehicle Operator Course facility) on the county’s 107-acre Coastal Highway property. The County offered the land as its matching contribution.
Confirmed via public reporting: The BOCC did approve the relevant land purchase from N.G. Wade Investment Company at its March 16, 2026 meeting (specifically five acres on Woodville Highway for Fire Rescue Station 3 relocation; public comments noted the proximity to the larger Point Blank project area). The letters went out two weeks before that approval.
Item 11 – Approve Amendment number 2 to the 2013 DMS radio tower lease at Smith Creek Fire Station. Minor boundary adjustment (131 sq ft) to cover Verizon equipment added post-Hurricane Michael. Lease runs through 2042 with possible 10-year renewal.
Item 19 – Ratify Amendment number 4 to the $800,000 state library grant (Agreement 24-PLC-20). This is the second after-the-fact ratification the Board has been asked to provide on this grant. Staff pushed the project from an 8,800 sq ft design to 12,500 sq ft, secured repeated no-cost extensions, and had the Chairman sign Amendment number 4 on March 26, 2026 without prior Board approval because the state deadline was the next day. The Board is now being asked to ratify it after the fact.
Many citizens already feel the administration is running the show rather than the elected Board. Florida’s Sunshine Law prohibits Commissioners from discussing public business outside of duly noticed meetings (no serial emails or side conversations).When staff and only the Chairman act unilaterally and then ask the full Board to rubber-stamp, it fuels the perception that the Board is being bypassed. Citizens would love to see the emails between staff and any other notified board members on these “urgent” sign-offs.
Item 20 – Approve selection committee rankings for RFQ 2026-01 (Professional CEI Services for Mashes Sands Pier Reconstruction) and authorize negotiations with top-ranked Dewberry Engineers, Inc. (253 out of 255 points). Note: Dewberry was on the email distribution list for the January 2026 Projects Meeting Agenda (which included a detailed procurement timeline and budget amount for the pier project). It is interesting that Dewberry was the only contractor listed on that particular January 22, 2026 email distribution. They full January 2026 Projects Meeting Agenda can be found here.
Item 21 – Approve selection committee rankings for RFQ 2026-02 (Design-Build Services for the Project Safety manufacturing facility) and authorize the County Administrator to negotiate with top-ranked Allstate Construction (final score 264.07 after oral presentations).
The facility is a 118,000 square-foot manufacturing building on county land, built and owned by the County, then leased to Point Blank. The negotiated contract returns to the Board at the April 10 special meeting. (More on this below under the full Project Safety cluster.)
Item 13 – Appoint one citizen-at-large to the Recreation Advisory Committee. One resume on page 266 of the full packet is worth a close look, especially since County Administrator David Edwards has previously announced plans to retire. Pure coincidence on timing?
Item 14 – Approve the 2026 Wakulla County Local Mitigation Strategy (LMS) Plan (embedded in the packet starting at page 277; over 200 pages). What it is and why it exists: The LMS is the County’s official, comprehensive, long-term blueprint for reducing risks to life and property from natural hazards (hurricanes, flooding, wildfires, etc.) and man-made hazards. It identifies local vulnerabilities, ranks mitigation projects by priority, and is required by FEMA every five years. Without an adopted, FEMA-approved LMS, Wakulla County loses eligibility for most federal and state hazard-mitigation grant funding after disasters. This update keeps the County eligible for millions in future recovery dollars.
The Heavy Hitters: Project Safety / Point Blank Enterprises Cluster (Items 15–18 and 21)
This is the biggest-ticket, highest-impact set of items on the agenda. Wakulla County is acting as developer: buying approximately 20 acres in Opportunity Park (from N.G. Wade Investment Company), designing and constructing a 118,000 square-foot manufacturing facility, then leasing the entire custom building to Point Blank Enterprises, Inc. (a South Florida-based protective-gear manufacturer with approximately 5,000 employees nationally and internationally). Point Blank promises approximately 300 “net new” jobs at wages above the Wakulla County “average”, +- $52K/yr + benefits. Detailed breakdown of what’s being asked:
Item 15 – Approve the First Amendment to the $13.5 million Triumph Gulf Coast grant for Project Safety. Extends the land-purchase deadline (originally end of 2025) into 2026 because of procurement delays, pushes construction completion to December 31, 2027, and moves the first performance metric deadline to December 31, 2033. All other terms unchanged.
Item 16 – Approve the full Economic Development Incentive Agreement between Wakulla County and Point Blank. This is the master contract. County builds and owns the facility; Point Blank leases it. Key terms include:
300 net-new jobs plus $8 million minimum capital investment by December 31, 2027.
Triple-net lease (Point Blank pays all taxes, insurance, maintenance, utilities).
County financing obligations structured to be prepayable/defeasible.
Point Blank must provide security instruments (guaranty, letter of credit, or surety bond) equal to the County’s financing exposure before construction begins.
If Point Blank defaults on job/investment requirements or grant compliance, it reimburses the County for any unreimbursed project costs plus attorney fees.
Purchase option at end of initial term (if grants allow) at fair-market-value appraisal.
Item 17 – Approve the initial terms of the Lease Agreement (final lease with exact rent comes back later).
Initial term equals greater of 10 years from Certificate of Occupancy or the date all County financing/grant obligations are satisfied.
Rent calculated to achieve county net-zero cost after grants (appraisal-based market rent adjusted by the percentage of project cost funded by grants; floors at the amount needed to offset the County’s delta). Rent is based on the 118,000 square feet. The rent is deliberately structured to make the County net-zero on its out-of-pocket costs after the $21.5 million in grants are applied but the actual number is still TBD
Automatic annual CPI increase (never decreases).
Triple-net: tenant pays everything.
Point Blank responsible for all fixtures/equipment installation costs beyond base building.
No subleasing without County consent.
No termination for convenience by either party during initial term.
At end of term, Point Blank must buy the facility/land (if grants permit) at appraised fair-market value.
Item 18 – Approve scheduling a Special Meeting on April 10, 2026 at 6:00 p.m. solely to: (1) award the Design-Build contract to Allstate Construction (Item 21) and (2) approve the financing documents (revolving line of credit) needed to cover the Project Cost Delta.
Item 21 – Authorize negotiations with Allstate Construction for the Design-Build contract (as ranked above).
Florida Job Growth Grant Fund: $3.5M Total grants secured: $21,504,369 Estimated total project cost: approximately $25.2M County covers the delta (about $3.7M) via financing (revolving line of credit). Grants are cost-reimbursement only, so the County fronts money and gets paid back.
Why Triumph Gulf Coast “oil money” is still OUR money
Triumph Gulf Coast, Inc. exists solely because of the 2010 Deepwater Horizon oil spill. After the spill devastated Northwest Florida’s economy, the State of Florida sued BP and secured a $2 billion settlement paid over 18 years. The Florida Legislature then passed the Gulf Coast Economic Corridor Act, directing 75 percent of those settlement dollars (roughly $80 million per year through 2033) into Triumph for economic recovery and diversification in the eight hardest-hit counties, including Wakulla.
In other words: BP paid the money because of the damage their spill caused. The Legislature took that money out of the state’s general revenue and gave it to Triumph. It is not a corporate gift or “oil company benevolence.” It is public settlement funds, taxpayer-backed reparations for real economic harm. Every dollar Wakulla receives and spends on Project Safety is money that could have gone somewhere else, and every dollar of County financing that isn’t covered by grants is ultimately backed by Wakulla taxpayers.
That is why many residents ask: with existing infrastructure strain, overcrowding, and the site sitting right on the Leon County line (jobs likely flowing to Tallahassee – use Wakulla CI as a reference), is this the best use of our finite public dollars?
Bottom line for taxpayers
This meeting green-lights the largest single economic-development project Wakulla has ever pursued. The Board will decide whether to move full speed ahead on a county-owned, taxpayer-financed manufacturing building leased to a private company, with real upside (jobs, diversification) but real risks (financing exposure, grant compliance, infrastructure pressure, and questions about local benefit).
The April 10 special meeting will be the next big vote on the actual construction contract and financing.
Understanding the Comprehensive Plan & Future Land Use (FLU) Map
This is Part 2 of the four‑part series on Wakulla County’s land use system. Part 1 provided the high‑level overview of how the three layers: Comprehensive Plan, zoning, and permits, work together. This section focuses on the top layer: The Comprehensive Plan and Future Land Use (FLU) Map, which sets the long‑term policy direction and maximum development limits for every parcel in the county. Newspaper notices for public hearings often reference changes to the Future Land Use category, such as: “Comprehensive Plan Amendment – Change from Rural‑2 to Urban‑1.” Understanding these categories helps residents interpret what a proposed change would actually allow.
The Future Land Use Map: Wakulla County’s Growth Framework
The Comprehensive Plan, required by Florida Statutes Chapter 163, establishes the county’s long‑term vision for growth over 20–30 years. The Future Land Use Element includes an interactive map (available on the county GIS portal) that assigns every parcel one of several land use categories. Any rezoning, subdivision, or major development must be consistent with the parcel’s assigned Future Land Use category.
Changing a parcel’s category requires a formal Comprehensive Plan Amendment, which involves:
public hearings
and, for larger changes, state review
⚠️ Important Note on Densities
Maximum densities listed below are ceilings, not guarantees.
In practice:
The Board of County Commissioners does not always strictly enforce these maximum limits or the associated site‑specific constraints.
Actual development potential is often higher than the stated maximums suggest, depending on how the commission interprets and applies the rules case‑by‑case.
Site‑specific factors – wetlands, Coastal High‑Hazard Areas (CHHA), lack of central water/sewer, concurrency, environmental protections –can reduce allowable density, but these constraints are not always applied consistently.
🏷️ Future Land Use Categories and Their Key Standards
Below are the primary FLU categories with their maximum residential densities, commercial intensity (FAR), typical allowed uses, and intended purpose.
🌾 Agriculture (Primary)
Max density: 1 unit per 20 acres (outside wetlands); 1 per 40 acres (wetlands)
Commercial FAR: 0.05
Uses: Farms, timber, rural estates
Purpose: Preserve large‑scale rural/agricultural land and prevent premature subdivision
🌿 Rural‑1 (Agriculture/Rural Fringe)
Max density:
1 per 5 acres (paved roads, outside wetlands)
1 per 10 acres (unpaved roads)
1 per 20 acres (wetlands)
Commercial FAR: 0.05
Uses: Low‑impact rural residential + agriculture
Purpose: Maintain very low‑density rural character with agricultural emphasis
🌾 Rural‑2
Max density:
1 per 2 acres (with central water)
1 per 5 acres (no central water)
1 per 20 acres (wetlands)
Commercial FAR: 0.15 (min. 1‑acre lot)
Uses: Rural homes + small‑scale neighborhood commercial
Purpose: Slightly more flexibility than Rural‑1 while staying low‑impact
🏡 Rural‑3 (Rural Residential)
Max density:
1 per 1 acre (with central water/sewer)
1 per 5 acres (no utilities)
Commercial FAR: 0.15 (min. 1 acre)
Uses: Single‑family homes + some small commercial
Purpose: Transition from rural to semi‑suburban development
🏘️ Urban‑1 (Urban Fringe)
Max density: Up to 2 units/acre (with utilities, outside wetlands/CHHA)
Commercial FAR: 0.15 (no utilities) → 0.3 (with utilities)
This post is part of a neutral educational series intended to help residents better understand Wakulla County’s land use system. For specific advice on a property or proposal, please contact the Planning & Zoning Division.
Newspaper advertisements for public hearings in Wakulla County frequently announce rezonings or comprehensive plan amendments. Common examples include notices such as “Rezoning from RR-5 to RSU-2” or “Change Future Land Use from Rural-2 to Urban-1.” These announcements describe proposed changes to how land may be developed.This four-part series provides a clear, step-by-step explanation of Wakulla County’s land use system. It is designed as a practical educational resource so residents can interpret public notices, understand what proposed changes would allow, and participate effectively in the review process.
The county’s land use regulations are organized in three layers that build upon one another:
The top layer is the Comprehensive Plan and Future Land Use Map, which establishes the long-term policy framework and density limits for every parcel.
The middle layer consists of zoning districts, which translate the broad policies into specific rules for permitted uses, lot sizes, and development standards.
The bottom layer includes site-specific reviews such as permits, site plans, and concurrency requirements.
Part 1 examines the overall structure of the system and explains how the three layers work together. Part 2 provides a detailed breakdown of the Future Land Use categories and their associated densities. Part 3 reviews the zoning districts, including their purposes, typical uses, and what a rezoning would allow. Part 4 describes the permit, site plan, and hearing process, including timelines and opportunities for public input.
By understanding these layers, citizens can more effectively review public notices, evaluate proposed developments, and provide informed comments during the appropriate stages of review. The strongest opportunities for influence typically occur at the comprehensive plan amendment stage, because later stages focus primarily on technical compliance with the adopted policies.
1. The Top Layer: The Comprehensive Plan and Future Land Use Map
The Comprehensive Plan serves as the long-term policy framework for growth in Wakulla County. Its Future Land Use Element includes an interactive map that assigns every parcel a land use category. All rezonings, subdivisions, and development permits must be consistent with the Future Land Use designation for that property. Changing a parcel’s Future Land Use category requires a formal amendment, which involves additional public review.
The main Future Land Use categories and their typical residential densities are as follows:
Agriculture: Focuses on farming and timber production. Density is generally one dwelling unit per 20 to 40 acres.
Rural-1: Very low-density rural and agricultural fringe. Density ranges from one unit per 5 to 20 acres.
Rural-2: Flexible rural residential. Density ranges from one unit per 2 to 5 acres, with some allowance for small commercial uses.
Rural-3: Entry-level suburban-rural transition. Density ranges from one unit per 1 to 5 acres.
Urban-1 (Fringe): Transition area near towns. Density may reach up to two units per acre with utilities.
Urban-2 (Core/Service): Higher-density areas with services. Density may reach up to 10 units per acre in fully serviced locations.
Sustainable Community: Planned higher-density development with supporting infrastructure.
Conservation and Conservation Residential: Areas protected for natural resources. Density is limited to one unit per 3 to 40 acres.
Commercial, Industrial, and Public Facilities: Focused on business, manufacturing, or public uses.
Town Center and Suburban Transitioning: Mixed-use areas, primarily in or near Crawfordville proper.
To determine the designation for any specific property, consult the interactive GIS portal before reviewing any public notice.
2. The Middle Layer: Zoning Districts
Zoning regulations, contained in Chapter 5 of the Wakulla County Land Development Code, implement the Future Land Use policies. A property’s zoning district must be consistent with its Future Land Use category. Rezoning changes the permitted uses, lot sizes, setbacks, and development standards for a specific parcel.The major zoning districts are grouped below with a brief description of their purpose, typical uses, and general scale.
Preservation, Conservation, Agriculture, and Rural Districts
P-1 Preservation: Provides strict protection for sensitive lands such as wetlands and critical habitats. Development is extremely limited.
P-2 Conservation: Protects natural resources with slightly more flexibility for low-impact uses than P-1.
AG Agriculture: Supports farming, timber operations, and rural estates on large lots.
RR-5 Rural Residential: Allows very low-density single-family homes, typically on minimum five-acre lots.
RR-2 Rural Residential: Provides slightly smaller lots than RR-5 while maintaining a rural character.
RR-1 / RR-1(a) Semi-Rural Residential: Serves as a transition toward suburban development with larger lots and a focus on single-family homes.
Semi-Urban and Residential Districts
RSU-1 Semi-Rural Residential: Offers low-to-moderate density single-family development as a transition from rural areas.
RSU-2 Semi-Urban Single-Family: Allows higher-density single-family homes on smaller lots where utilities are available.
R-1A / R-1 Single-Family Residential: Establishes standard single-family neighborhoods and protects existing residential character.
R-2 Two-Family (Duplex) Residential: Permits duplexes and attached single-family units at moderate density, typically requiring sidewalks and open space.
R-3 Multifamily Residential: Allows apartments and condominiums at higher densities in areas with strong infrastructure.
RTH Townhouse Residential: Provides for attached townhomes in a clustered configuration.
RMH-1 Mobile Home Residential: Permits manufactured homes on individual lots.
RMH-2 Mobile Home Park: Allows organized mobile home parks with varying densities.
Commercial, Industrial, and Mixed-Use Districts
CO Office Commercial: Accommodates professional offices with low traffic impact.
C-1 Neighborhood Commercial: Supports small-scale shops and services for nearby residents.
C-2 General Commercial: Allows broader retail and service uses with higher traffic potential.
C-3 Heavy Commercial: Provides for larger or more intensive commercial activities, such as auto sales.
C-4 Downtown Commercial: Focuses on mixed retail and office uses in the Crawfordville area.
I-1 Light Industrial: Supports low-impact manufacturing and warehousing.
I-2 Heavy Industrial: Accommodates more intensive industrial operations.
TC Crawfordville Town Center: Permits mixed-use development in the town core.
CC Crawfordville Cottage Commercial: Allows small-scale commercial uses in the Crawfordville area.
HIC / LIC: Designates high-intensity or low-intensity commercial areas.
LDR / HDR Overlays: Adjust density standards in specific locations.
Other and Special Districts
CTTP Travel Trailer Park: Provides for recreational vehicle and camper parks.
PUD Planned Unit Development: Offers flexible mixed-use development with custom standards; density bonuses may be available when consistent with the Future Land Use category.
RC-1 Rural Commercial: An older district for limited rural business uses (may be limited or repealed in some areas).
Current zoning for any parcel can be viewed on the county GIS portal. A rezoning application changes the applicable rules for that property.
3. The Bottom Layer: Permits, Site Plans, and Concurrency
Even after Future Land Use and zoning requirements are satisfied, individual projects must obtain site plan approval, demonstrate concurrency (adequate capacity for roads, water, wastewater, schools, and other services), and secure development permits. These reviews ensure compliance with detailed standards for drainage, environmental protection, and infrastructure.
Public notices for rezonings, major site plans, and related approvals are published in the newspaper, posted on the property, mailed to nearby owners, and listed on the county website. Hearings are held before the Planning Commission (advisory) and the Board of County Commissioners (final decision).Approvals at this stage frequently pass with strong majorities when proposals meet technical requirements. Citizens can participate by reviewing notices, attending hearings, and submitting written comments. Effective participation at the comprehensive plan amendment stage offers the broadest opportunity to influence long-term outcomes, as later stages focus primarily on technical compliance.
This guide and the four-part series are intended solely as an educational resource to help Wakulla residents become better informed participants in local land use decisions. For questions about a specific property or proposal, please contact the Planning & Zoning Division directly.
Recently a neighbor reached out to us and asked us to look into NG Wade’s land ownership footprint in Wakulla County and how it may affect our future. Traffic from Crawfordville to Tallahassee is already a daily grind, and with the county growing fast, questions about what’s next are everywhere. The reality: a big push to widen key sections of the highway, and major landowner NG Wade Investment Company stands to gain big from the upgrades.
Quick Rundown on the Plan
The Capital Region Transportation Planning Agency (CRTPA), which handles regional planning for Leon and Wakulla counties, has studied this corridor for years. The 2011 Woodville Corridor Study promoted “smart growth”: focus development in compact “nodes” (like around Commerce Blvd. and SR 267), add sidewalks, bike paths, trails, possibly a parallel road, and skip widespread four-laning to safeguard rural character, wetlands, and forests.
Now, in the Year 2050 Regional Mobility Plan (recently adopted), widening Woodville Highway from Paul Russell Road to Capital Circle SE (about 2.1 miles in Leon County) ranks as the top-priority roadway project. That means expanding from 2 lanes to 4 lanes, with right-of-way acquisition already lined up in funding estimates (around $17M+ just for land buys). FDOT runs the project delivery: PD&E (Project Development & Environment) studies complete, design underway, and construction phases expected in the 2030s, though timelines could shift.
The drivers? Wakulla’s population surge means more daily commuters to Tallahassee jobs, plus needs for hurricane evacuation routes. Many locals argue this creates induced demand: more lanes lead to more development, which means more traffic down the line. The earlier study aimed to limit that with stricter land-use rules, but current plans prioritize added capacity.
Most Wakulla residents haven’t caught the full picture because MPO (Metropolitan Planning Organization) plans often stay in meetings and documents, not headlines, until construction starts.
NG Wade’s Land Holdings and Community Development Stakeholders
NG Wade Investment Company, a Jacksonville-based, family-owned firm operating since 1914, holds one of the largest private land positions in the Woodville Highway corridor, concentrated in northeast Wakulla near the Leon County line. Their flagship asset is Opportunity Park, a 240‑acre industrial Planned Unit Development (PUD) off Commerce Boulevard, directly connected to Woodville Highway. The site is entitled for light industrial, manufacturing, and commercial use, with utilities already in place (power, water, sewer, fiber) and capacity for up to 1.9 million square feet of build‑out.
The park’s longtime tenant, CSG International, recently closed, and new activity is underway. Point Blank Enterprises, a body‑armor manufacturer, is constructing a major facility between 2025–2027, projected to add 300+ jobs with state and county tax dollars funding the project. Wakulla County purchased land from NG Wade for public development and is leasing it back to Point Blank as part of the deal.
A 2023 Wakulla News article outlines the broader development framework for this area, including the community organizations that will review and approve projects within the corridor. We encourage residents to look at the Form 990 filings and listed board members for these organizations, it’s a clear window into who the insiders are shaping your community and why transparency matters.
Upon approval from the DRC, the second step is to submit building plans to the Building Department for permitting. Throughout this process, the DRC isn’t required to hold any public meetings.
The Span
Beyond Opportunity Park itself, NG Wade controls more than 3,000 additional acres surrounding the site. These acres fall under a separate mixed‑use development agreement that allows commercial, light industrial, and residential projects. All of it ties directly into the planned Woodville Highway improvements – creating faster freight routes and high‑value locations for new homes, warehouses, and future subdivisions.
In short: the north side of Wakulla is positioned for significant development, and the scale is larger than most residents realize. Hold on to your hat, Wakulla.
In total, NG Wade holds at least 3,240+ acres in the immediate corridor area (240 in Opportunity Park plus the surrounding 3,000). That’s a huge footprint in a rural zone, and highway upgrades could dramatically boost land values, rezoning potential, and development profits. This pattern isn’t unusual in Florida growth areas but when congestion is already bad, it prompts questions about who truly benefits: daily drivers or large landowners turning acreage into major returns while the existing residents suffer the fall out.
Why This Matters to Wakulla Folks
If you’re stuck commuting daily, concerned about development swallowing rural land, or seeing tax dollars fund infrastructure that pads developer pockets, this plan affects you directly. Widening could provide short-term relief, but without tight controls, it risks turning quiet areas into more traffic and development.
Efforts Still Matter
Public input can still shape things. CRTPA and FDOT hold workshops.
A video below shows what NG Wade owns for the most part, highlighting Opportunity Park and surrounding holdings tied to the corridor. This isn’t hidden info, but it isn’t broadcast widely either. Share with anyone grinding on Woodville Hwy, they deserve the details.
Stay sharp, Wakulla!
NG Wade Land Ownership from Wakulla County Property Appraiser’s Website
Wakulla County is taking important steps to safeguard Wakulla Springs, one of Florida’s most precious natural resources, along with the surrounding aquifer, rivers, and coastal waters. Many older homes and neighborhoods still rely on septic tanks, which can leak nutrients like nitrogen into the groundwater. Over time, this contributes to algae growth, reduced water clarity, and harm to wildlife and recreation in our springs and waterways.
To address this, the county is actively converting homes from septic systems to a modern central sewer system (septic-to-sewer projects). These upgrades are largely funded by generous state grants from the Florida Department of Environmental Protection (FDEP), part of statewide efforts under Governor DeSantis to invest billions in water quality restoration and springs protection.
A key funding vehicle is grant agreement LPS0111, which totals around $11.1 million for multiple phases. This covers areas such as:
Wildwood Phase I
Eagles Ridge Phase II – Unit 1
The Park (allocated about $5.5 million)
Eagles Ridge Phase I – Unit II
These projects aim to connect hundreds of homes (approximately 120 in The Park and 41 in one Eagles Ridge unit) by installing gravity sewer collection lines, lift stations (pumps to move wastewater uphill or to other lines), and connections to the county’s existing force main. The work abandons old septic tanks and ties homes into the cleaner, centralized system.
This is worthwhile work. It helps meet state requirements for springs protection, reduces pollution from failing or overloaded septic systems, supports safe growth, and preserves the natural beauty that draws people to Wakulla County.
Dewberry Engineers’ Long-Standing Role
Dewberry Engineers Inc. (headquartered in Virginia but with a strong Florida presence, including offices in Blountstown and other Panhandle locations) has been deeply involved in Wakulla’s wastewater planning since at least 2020. They prepared major foundational reports, including:
The 2020 Sewer Infrastructure Facilities Plan, a detailed blueprint for upgrading transmission lines, treatment plants (like Otter Creek WWTP), and discharge methods to handle growing flows while meeting FDEP rules.
A 2021 Wastewater Feasibility Analysis, focusing on nitrogen reduction in the Wakulla Springs basin, mapping septic systems, and identifying expansion opportunities.
These documents gave Dewberry extensive knowledge of the county’s infrastructure, growth patterns, and regulatory needs. As a result, they’ve secured ongoing contracts through competitive processes (like RFQ 2022-19 under Florida’s Consultants’ Competitive Negotiations Act). Their services typically include planning, design, permitting, bidding support, and Construction Engineering and Inspection (CEI), which means overseeing builders during construction to ensure everything meets plans, permits, and standards.A timely example is on the March 2, 2026, Board of County Commissioners (BOCC) agenda: Approval of Work Authorization No. 26-05 with Dewberry for $645,310 specifically for The Park septic-to-sewer project. This covers design, permitting, engineering, bidding help, and project management/CEI.
How the $645,310 Breaks Down (in Simple Terms)
The contract has three main parts:
Design and Permitting ($312,810 fixed price): Mapping the land (topographic survey), creating detailed plans (from preliminary to final), sizing pipes and lift station, planning road and drainage fixes after digging, soil testing if needed, helping identify easements (rights to use land for lines), and coordinating permits with agencies like FDEP.
Bidding and Contractor Selection ($7,500 fixed price): Preparing bid documents and specs, holding pre-bid meetings, answering contractor questions, reviewing bids, and recommending who gets the job.
Project Management and Construction Oversight (CEI) ($325,000 hourly, not to exceed): The largest chunk (about half). Includes pre-construction meetings, site visits and inspections, bi-weekly contractor check-ins, writing daily/weekly/monthly reports (noting things like rain delays), reviewing materials/tests/final drawings, approving contractor payments, handling change orders, ensuring permit compliance, assisting with FDEP quarterly reports, and wrapping up the project.
For context, professional engineering fees on similar Florida projects often run 10–20% of construction costs, and CEI (oversight) 8–12%. If The Park construction is around $4–5 million (based on grant allocation), $645k lands in the 12–16% range, which is higher but not unheard of for grant-funded, environmentally sensitive work with strict rules.
Fair Questions for Residents to Consider
Dewberry delivers specialized expertise on these technical projects, and their work supports important environmental goals. At the same time, when a single firm earns substantial fees from public and grant money (potentially $1.5–2 million+ across all LPS0111 phases, or 13–18% of the total grant), it’s reasonable for taxpayers and residents to stay informed and ask thoughtful questions.
Some points worth watching:
Heavy reliance on hourly billing for oversight ($325k not-to-exceed in this WA): No public breakdown of hourly rates by staff, estimated hours, or limits on meetings/inspections/reports. “Periodic” visits, “resolving issues,” or “unanticipated conditions” can lead to higher bills if not closely monitored.
Exclusions that often lead to add-ons: Key items like full surveys for easements, actual permitting fees, construction contract documents, and “any services not listed” are excluded. The 2020 plan itself flags needs for easements, geotech testing, and heavy FDEP coordination, things that are predictable but could trigger future amendments (extra Board approvals and costs).
Separate contracts per neighborhood/phase: Oversight is split (e.g., individual WAs for Wildwood, Eagles Ridge, The Park) rather than one program-wide deal. This can make the full Dewberry spend across grants harder to track without adding them up.
Amendments are common in these projects: Site surprises (karst soil, weather, contractor delays) happen often. The contract’s exclusions, hourly structure, and “additional services” clause provide easy paths for changes, and Dewberry’s early knowledge makes them the natural choice for follow-up work.
None of this suggests wrongdoing. It’s how many engineering firms structure contracts for complex, phased programs. But when public funds are involved, transparency and strong oversight maximize value and build trust.
Where Things Stand in Early 2026Progress continues across Wakulla:
Earlier phases in Wakulla Gardens, Magnolia Gardens, Edgewood/Golden Gate, and others are complete or wrapping up.
Wildwood Phase 1 sewer expansion is gearing up (community meeting held; construction expected to start soon).
Wakulla Gardens Phases 5–7 and others anticipated in 2025–2026.
Lake Ellen septic-to-sewer (around 403 homes) and other areas like Panacea lift stations saw approvals/funding discussions in early 2026 BOCC meetings.
The Park and Eagles Ridge Phase 2 received a big boost: $7.3 million+ in 2025 FDEP Springs Protection Grants (part of a larger $15.7M award), funding connections and nutrient reductions.
The county’s Septic-to-Sewer Project Portal has an interactive storyboard/map to check your area’s phase/status, plus forms for questions/feedback.
The March 2, 2026, BOCC meeting includes this Dewberry item. Public comment is open. Consider asking:
Why is half the contract hourly without detailed rates, hour estimates, or caps?
Could more routine oversight be fixed-price for efficiency?
What’s the total Dewberry spend across all LPS0111 phases, and how is it tracked?
How are amendments reviewed/approved to prevent overruns?
Are there comparisons to similar projects in other Florida counties?
Septic-to-sewer conversions are essential for cleaner water, healthier springs, and a sustainable future. Good questions and public engagement help ensure every grant dollar goes as far as possible.
Residents: Review the documents, check the portal for your neighborhood, attend meetings, and speak up. Your involvement keeps accountability high and helps deliver the best results for our community and environment.
Hey Wakulla neighbors, if you are frustrated with rapid development, rising costs, traffic, and the sense that local voices are being pushed aside, you are not imagining it. Several bills moving through the Florida Legislature right now would make it easier for large developers to build more, build denser, and build faster, while reducing the tools counties like ours use to manage growth and protect our rural character, springs, and quality of life.
These are not small adjustments. They are state-level overrides that reshape housing, zoning, taxes, and land use across Florida, including right here at home.
Below is the plain‑English breakdown of the bills that affect Wakulla the most.
Live Local Act Changes (HB 1389)
What it does:
Counties lose the ability to opt out of tax breaks for “missing middle” housing such as townhomes, duplexes, and small apartments.
By the end of 2026, Wakulla must allow accessory dwelling units, including backyard rentals and in‑law suites, in single‑family neighborhoods.
More properties, including county land and church land, can be pushed into multifamily development.
Bottom line: Less local control over density, more units built quickly, and more pressure on roads, schools, water, and septic‑to‑sewer systems.
Blue Ribbon Projects (HB 299)
What it does:
Mega‑developments on 15,000 acres or more receive special fast‑track treatment.
Developers must conserve 60 percent of the land and include some affordable housing, but the state presumes the project fits our comprehensive plan unless the county can prove otherwise in detail.
Bottom line: Wakulla has large rural tracts that could qualify. If a landowner proposes a massive planned community, it becomes much harder for the county to stop it. This shifts power toward developers and away from local decision‑making.
Compatibility Rules, Harder to Block “Bad Fit” Projects (SB 208 and HB 399)
What it does:
Counties cannot deny projects simply because they do not match the surrounding neighborhood.
Denials must be based on specific, provable impacts such as traffic, water capacity, or infrastructure limits.
Manufactured homes must be treated the same as site‑built homes in zoning.
Bottom line: It becomes much harder to protect quiet rural areas or low‑density neighborhoods from out‑of‑place development. Wakulla’s small‑town, springs‑focused character becomes more difficult to defend.
🌤️ A Few Small Silver Linings
More stable state sales‑tax revenue for fiscally constrained counties, and Wakulla may qualify.
No permit needed for home repairs under $7,500, excluding plumbing and electrical work.
More searchable online budgets for transparency.
Overall Impact on Wakulla
These bills collectively push more development, faster approvals, less local veto power, and tighter county budgets. If you want Wakulla to remain rural, slow‑paced, and springs‑protected, this legislative session is moving in the opposite direction.
📣 What You Can Do Right Now
Contact your state legislators. Tell them you are a Wakulla resident concerned about losing local control over growth, density, and quality of life. Mention specific bills such as HB 1389, HB 299, and SB 208.
A short, polite message works best:
“I am a Wakulla resident. Please oppose bills that take away local control over housing density and growth. Wakulla needs the ability to protect our rural character and springs.”
……And Why the Board Has Finally Run Out of Excuses
Wakulla County is at a breaking point and everyone knows it. The people who live here every day, who pay the taxes, who sit in traffic, who watch their kids get rezoned, who see the springs they grew up loving turn cloudy… they’re done.
Done with piecemeal approvals. Done with “just six homes.” Done with developers buying rural land cheap and demanding instant density windfalls. Done with a Board that, for far too long, made it easy to approve growth and hard for the public to be heard.
But that era is over. And CPM25‑04 is the first real test of whether the Board understands that.
A Quick History Lesson the County Would Prefer You Forget 🕰️
From roughly 2014 through 2025, regular BOCC meetings were held at 5:00 p.m. on weekdays, a time when most working residents were still on the job, stuck in traffic, or picking up kids. Many meetings lasted 20 minutes or less.
And what got pushed through during those lightning sessions? Land‑use changes. Comprehensive plan amendments. Density increases. Zoning flips.
The pattern was obvious: Low attendance = low opposition = easy approvals.
But the public woke up. People started reading agendas. They joined community groups. They started commenting on social media (until the BOCC turned off the comments – don’t worry, we’ve got your back!) They requested public records. They coordinated campaigns.
And the Board felt the pressure. The shift to 6:00 p.m. meetings (effective November 2025) was not a gift – it was a concession – a lone commissioner asked for it, and we were given a glimmer of grace.
Now the public is watching. And they’re not going anywhere.
Enter CPM25‑04 – The Test Case of Whether the Board Is Listening 👀
Golden Construction Company, Inc. is asking for a large‑scale comprehensive plan map amendment for 30.42 acres on Jack Crum Road.
This is not a small request. This is not a harmless request. This is not a responsible request.
This is a textbook example of why residents are furious.
Let’s break down the reasons – clearly, factually, and without sugarcoating.
🏷️➡️💰 The Developer Bought the Land Knowing the Rules – Then Tried to Change Them Just a Handful of Months Later
Golden Construction purchased the parcel in June 2025. At that moment, it was designated Agriculture FLU and AG zoning:
1 dwelling per 20 acres
Maximum of 1.6 homes
They bought rural land at rural prices under rural rules. Then – less than six months later – they asked the Board to quadruple the density.
This is not “planning.” This is not “growth management.” This is speculation.
Buy cheap → demand a density windfall → subdivide → sell high.
And every time the Board approves one of these quick‑turnaround flips, it reinforces the public’s worst fears: If you have money, the rules don’t apply to you.
🌲🚫🏘️This Is Not “Infill” – It’s Scattered Rural Sprawl in a Sensitive Area
Jack Crum Road is a quiet, sparsely developed rural corridor. Surrounding parcels are overwhelmingly Agriculture FLU and AG zoning.
Public notices went to fewer than 15 adjacent owners.
This is not infill. This is not urban edge. This is punching a hole in one of the last remaining rural areas near the coastal fringe.
Approve this, and the dominoes fall: One “just six homes” becomes the precedent for the next parcel… and the next… and the next.
Wakulla Springs BMAP / PFA2: Adding More Septic Here Is Environmental Sabotage 💧⚠️
This parcel sits deep inside the Wakulla Springs Basin Management Action Plan (BMAP) Primary Focus Area 2 – one of the most nitrogen‑sensitive zones in the entire state.
Here’s what the science says:
Standard septic: 11.49 lb nitrogen/year
Enhanced INRB septic: 6.44 lb/year
Central sewer (AWT): 0.47 lb/year
There is no central sewer on Jack Crum Road. The proposal is private wells + enhanced septic.
That means more nitrogen loading into the aquifer that feeds Wakulla Springs – an already imperiled natural treasure.
And we all know how this story ends: Developer installs septic → sells lots → nitrogen increases → county applies for grants → taxpayers pay to convert the septic later.
We’ve seen it in:
Wakulla Gardens
Magnolia Gardens
Lake Ellen
Crawfordville East
Panacea/Mashes Sands
And dozens more
Why repeat the same mistake?
🚧Infrastructure, 🚸Schools, and Roads Are Already Redlining
Wakulla is drowning in catch‑up projects:
Lake Ellen septic‑to‑sewer ($15.6M)
Wakulla Gardens Phases 5–7
Magnolia Gardens conversions
Crawfordville East V–VI ($6.1M)
Newport water tank/generator
Panacea inflow fixes
Schools? Bursting. Rezoning again for 2026–27. Portables everywhere.
Roads? Jack Crum was never designed for subdivision traffic.
Impact fees? NONE.
Who pays? Existing residents.
The County’s Own Analysis Says We Don’t Need This
The 2017 Residential Needs Analysis concluded Wakulla already has enough planned density to accommodate growth through 2035.
The applicant’s rebuttal? “Market preference.”
Translation: We want to build here because it’s profitable.
That is not a public purpose.
The Public Has Spoken – Loudly, Repeatedly, and in Unison 📣🔥
The packet shows multiple written objections. January 2026 saw a wave of coordinated emails from residents across the county.
This is not scattered opposition. This is organized, informed, community‑wide resistance.
And staff’s recommendation? Option #3: Board Direction. Not approval. Not denial. Just… caution.
That speaks volumes.
🚫The Bottom Line: Deny It. Or Postpone Until Sewer Exists.
The Board has full discretion to deny CPM25‑04. Legally. Ethically. Responsibly.
Because:
The developer bought under Agriculture rules – hold them to it
BMAP/PFA2 demands nitrogen reduction – not new loads
Taxpayers are tired of paying twice – once for the septic (at home purchase), once for the conversion (then the grants make EVERYONE pay)
Schools and roads are maxing out – no capacity (some argue they already are at max)
The public is awake – and watching
This isn’t anti‑growth. This is anti‑reckless‑growth. This is pro‑Wakulla.
Commissioners: The 5:00 p.m. days are over. The public is in the room.
Deny CPM25‑04. Or at the very least, postpone it until sewer is feasible and infrastructure catches up.
Wakulla deserves better than another preventable mistake.
You can turn off Facebook comments on YOUR page, but Wakulla Reports will be live at 6 p.m. on February 17, 2026 and up for commenting!
Tomorrow night — Monday, November 17 @ 6:00 p.m. — the Board of County Commissioners will consider two agenda items that show exactly how county-wide housing policy and local land-use decisions intersect.
🗂️ Item 20 – CPM25-04: Jack Crum Road
📍 Location: North side of Jack Crum Road, ~0.85 miles east of Coastal Highway 98 (Lot 3, Gray’s Estate Subdivision) 🗺️ Request: Change future land use from Agriculture to Rural-1
🔎 Current (Agriculture)
🏠 Max density: 1 dwelling per 20 acres
🏗️ Realistic build-out: 1–2 homes total
🚰 Utilities: Individual wells & septic tanks
🆕 Proposed (Rural-1)
🏠 Max density: 1 dwelling per 5 acres(Jack Crum Road is paved)
🏗️ Realistic build-out: Up to 6 homes total
🚰 Utilities: Still no central water/sewer nearby
🧭 Zoning: Remains AG(no rezoning required later)
📚 What the Official Record Shows
🏫 Elementary Schools
School Board says no elementary capacity under current enrollment and Five-Year Work Plan
Middle & high schools have room
Concurrency checked later, but shortfall is already on record
🌊 Wakulla Springs Protection (BMAP)
Parcel sits inside Primary Focus Area 2 — highly sensitive for nitrogen loading
Even nitrogen-reducing septic systems still add nitrogen and count against county’s reduction targets
🧪 Groundwater Concerns
A neighbor submitted public records showing a former landfill on/near the property
Past groundwater contamination documented
Florida DEP will decide if drinking-water wells can be permitted
🚗 Traffic & Roads
Traffic study says six homes won’t require a turn lane on Jack Crum Road